Exhausts installed, engine installed in chassis, coils added, chassis extended for brakes and suspension.
Getting the engine in and aligned was troublesome. Very tight fit, engine mounts weren't perfectly aligned, and so engine not straight. Draw back of self tap screws for holding parts in place. Once the hole is wrong that's it. Anyway, I think we're there but won't know for sure until the wheels are on.
Plenty of remedial paint work required for reset joints in the chassis - another drawback of white metal frames.
Step 2 was installing the exhaust headers. Didn't get a photo before the engine went in the frame.

Step 3 was installing engine in the chassis. As said a very tight fit. The photo above shows the engine about 1mm out of alignment. I needed the second stage frame to pull in back in line. Though I have learnt a lot about the order of things. For example, despite instructions, don't install engine mounts before it goes into the frame. If I build another, I think it would be a way lot quicker.



Next step was gearbox and exhaust pipes


Last step on pg2 is stage 2 of the chassis for rear body work and suspension and wheel mounts. The unpainted piece is to help keep it square and part of the third stage of the chassis.


I think once the chassis is complete the build should go a little faster.
cheers
Michael